Replacing Timber with uPVC
The timber frontage to this building had been there since the flats were first built in 1997 and was more than ready for an upgrade.
After a recommendation about our company, the owners approached us looking for help to design something which would replace this; being told by many others that it could not be done. Challenge accepted!
Careful design, planning & measures took place and a bright, secure and welcoming entrance was created. A fantastic job completed by both the design and installation teams!
By accepting you will be accessing a service provided by a third-party external to https://www.evolveconservatories.co.uk/